LIVE VIDEO: Live at Five at Four    Watch
 

TDOT closes 1 lane of US 25W bridge in Clinton

1:56 PM, Apr 10, 2013   |    comments
  • Share
  • Print
  • - A A A +

From TDOT:

Beginning at 4 a.m. on Wednesday, April 10, 2013, the US 25W (SR 9) Bridge over the Clinch River in Clinton will be reduced to one lane in each direction as crews begin bridge repairs.

These lane closures will remain in place around the clock until repairs are complete. This project is estimated to be completed on or before June 30, 2013.

Motorists should be alert for changed conditions and expect potential delays in this area.

Most Watched Videos